ATTENTION Visual Arts students: Building maintenance at CSB 12/26-28

From December 26-28, building maintenance will be administered to the Civic Square Building at 33 Livingston Avenue. During this time, there will be no heating or cooling in the building and the building will be subject to outside temperatures; expected high of 41°F and low of 24°F. Exhaust fans will also be shut down during this time.
 
This is a result of replacing heating coils in the air handling units, and not an elective cost saving procedure as was policy in the past.
 
Due to the lack of proper heating and ventilation, students are discouraged from working in the building during this time. The work schedule is tentative, and these conditions could extend through December 30.
 
Posted December 2012